Laserfiche WebLink
B R A�! N Braun Intertec Corporation I Phone: 952.995.2000 <br /> 11001 Hampshire Avenue S Fax: 952.995.2020 <br /> i[�T E Rfi E C Minneapolis. MN 55438 Web: braunintertec.coro <br /> �n»ed.�.Yona�uec�. I <br /> Structural Steel Special Inspection Final Report I <br /> City of: Orono Date: February�12, 2015 <br /> Attention: Ms.Jessic�a Loftus <br /> Project: Orono Police Department Expansion <br /> 2370 Kelly Parkway <br /> �_ <br /> Orono, MN 55356 <br /> —T— <br /> Braun Intertec Project: B14-05902 <br /> In accordance with the Minnesota State Building Code,Section 1704 of the International Building Code <br /> and the agreed-upon scope of services,the required special inspections and testirig have been provided <br /> for the following items: <br /> Bolting. The bolted connections detailed in the attached Special Inspection Daily Reports were <br /> observed in general accordance with the requirements of the plans and specifica�ions.There are <br /> currently no outstanding or unresolved bolted connection-related issues. <br /> Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily <br /> Reports were observed in general accordance with the requirements of the proje�t plans and <br /> specifications. Discrepancies were noted and documented. These connections w�re found to be <br /> acceptable following the required corrections.There are currently no outstanding�or unresolved <br /> structural welding-related issues. <br /> Metal Deck Welding and Fasteners. The metal deck welding and side-lap fasteners detailed in the <br /> attached Special Inspection Daily Reports were observed in general accordance with the requirements <br /> of the project plans and specifications.There are currently no outstanding or unre�lsolved decking- <br /> related issues. <br /> Mechanical Fasteners. The mechanical fasteners detailed in the attached Special Inspection Daily <br /> Reports were observed in general accordance with the requirements of the plans�nd specifications. <br /> Discrepancies were noted and documented. These connections were found to be acceptable following <br /> the required corrections. There are currently no outstanding or unresolved mechalnical fastener-related <br /> issues. <br />