My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 12:02:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Issue Date: 2014/08/01 Rev No.: 0 <br /> sr�wuN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> �ity of Orono, MN. Page 1 of 1 <br /> Report No.: Structural Steel#3 Date of this Report: 11-03-14 <br /> Project Name: Orono Police Department Expansion Project (No.: B14�05902 <br /> Project Address: 2730 Kelly Parkway <br /> Client: City of Orono Client Project No.: <br /> Weather: Partly Cloudy PM Mark Flynn Temperature: ° F <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Founclations ❑ Special Cases: <br /> � Periodic �Welding � Bolting ❑ Concrete Placement ❑ Fireproofing <br /> ❑ Piles & Piers ❑ Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Below) ❑ No <br /> Description and location of work campleted: <br /> 1) Screen wall plate fillet welds to tube steel column and bar�oist at Roof LPvel Grid E3-�C 6 to North revised detail 11/501 <br /> bottom side now completed. No discrepancy noted <br /> 2) Outstanding discrepancy on Report#1 10-17-14 tek fasteu�ers now installed from �:hannel to light gauge metal stud <br /> Grid B-C 6 to North detail 4/S502. No discrepancy noted <br /> 3} Outstanding discrepancy on Report#1 10-17-14 tek fasteners now installed from deck support angle to light gauge <br /> metal stud Grid B-C 6 to North detail 7/S502. No discrepanc,y noted <br /> 4) Outstanding discrepancy on Report#1 10-17-14 Tube steel fillet welds�t Grid C-D 1-2 detail 1/S502 welds now <br /> installed at west cantilever end. <br /> 5) A325 1/2", 5/8"and 3/4" hexhead bofts at premanufactured building, snug tight, pliie�in dire�t contad with full nut <br /> engagement present. <br /> _ _ -------______ <br /> List tests pe�Formed: <br /> Visual <br /> • Are there any discrepancies noted from this day's observati�nns? Yes ❑ No � <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No � <br /> � If yes, see attached Summary Sheet. <br /> ■ Report given to Contractor: Yes � No ❑ <br /> To the best of our knowtedge, work inspected was done in ac�ordance with the approved plans, specifications, and <br /> applicable woricmanship provisions of the current IBC, except as noted abov�e. <br /> Signed: �-��-— Graham, Dan Date: 11-03-14 <br /> Print Full Name: Daniel P. Graham I.D. No.: 1054095 S18S2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.