Laserfiche WebLink
�---- Issue Date: 2013I01101 Rev No.: 0 <br /> �4` Summary of Discrepancies Needing Correction or Review <br /> � by the Design Engineer or Architect <br /> Project Name: Orono Police Departrnent Expansion B 14-05902 Structural Steel <br /> Project Address: 2730 Kelly Parkway,Orono,MN. PM Mark Flynn <br /> The following items must be reviewed by the engineer and/or corrected and/or inspected before work can icontinue in the <br /> area. <br /> Report No. Report Description Resolution to O/C Status <br /> Date Discre anc <br /> *1) Various random locarions tek fasteners missinglnot installed and closed 11-03- <br /> 1 10-1'1-14 installed from channel to light gauge metal stud Grid B-C 6 to completed 14 <br /> North detail 4/5502. <br /> *2) Various random locations tek fasteners missing/not �nstalled and closed 11-03- <br /> I 10-17-14 installed from deck support angle to light gauge metal stud Grid completed 14 <br /> B-C 6 to North detail 7/5502. <br /> 1 10-17-14 '`3) Tube steel fillet welds at Grid C-D 1-2 detail llS502 wetds ins[alled and dosed 11-03- <br /> missin at west cantilever end. com leted 14 <br /> � <br />