My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A non-structural steel special inspection final report-2015
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2730 Kelley Parkway - 33-118-23-12-0007
>
Misc
>
A non-structural steel special inspection final report-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:43 PM
Creation date
3/28/2017 11:58:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> s Rau N <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Reporf No.: #29 Dafe: October 15,2014 <br /> Project Name: Orono Police Dept.Expansion ProJect No: Bl 4-05902 <br /> ProJect Address: 2730 Kelly Pkwy. Braun Interfec PM: MARK FLYNN <br /> Clienl: City of Orono CIIeM ProJect No.: <br /> Weafher: Partly Cloudy TemperaFure: 50°f <br /> Type of Inspedion: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles&Piers ❑Tendon Placement �Soils <br /> Did the architect or engineer authorize changes to approved plans2 Yes❑ (Listed Below) No � <br /> Descripfio�and IoccFfon of work completed: <br /> -Observed the soils in the bottom of the excavation for footings for new sign base located at the norfh and south <br /> entrances into the west parking lot. Performed random hand auger probes in the bottom of the footing excavation and <br /> the soils appear to be suitable for the designed footing bearing pressure. <br /> -Recommended the contractor place cleor crushed rock in the bottom of the excavation for the new sign bases <br /> because of water in the bottom of the excavation. <br /> List tests pertortned: <br /> • Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> • Are ihere any outstanding discrepancies on this project� Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emailed to: , <br /> Jack Broncryk-jack.broncrykQkrausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the cuRent IBC,except ps noted above. <br /> ,��� � Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> Prouiding engineering and environmental so(utions since 1957 <br />
The URL can be used to link to this page
Your browser does not support the video tag.