Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Report No.: #27 Date: October 13,2014 <br /> Project Name: Orono Police Dept.Expansion ProJect No.: 614-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun In4erFec PM: MARK fLYNN <br /> Clienf: City of Orono Client Project No.: <br /> Weather: Partly Cloudy Temperature: 50°F <br /> Type of Inspedion: Inspedion Coverage: <br /> ❑ Continuous ❑ Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Weldng&Bolting �Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans? Yes❑ (Listed Below) No � <br /> Descripfion and location of work compl�fed: <br /> -Observed the placement of rebar for interior slab on grade @ Grid A to E from 1 to 6. <br /> -Observed the placement of concrete for interior slab on g�ade @ Grid A to E from 1 to 6.Sampled and tested the <br /> concrete for slump,air conient and temperature.Cast 1 set of 5-4x8 cylinders(Set#18&#19). <br /> list tests performed: <br /> Set#1 B=Siump-5 1/2",Air Content-2.44b,Temperature-67,Sample#50205 <br /> Set#19=Slump-6 1/4",Air Content-3.3�0,Temperature-64,Sample#50228 <br /> • Are there any discrepancies noted from this days observations� Yes ❑ No � <br /> • Are there pny outstanding discrepancies on this project2 Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Reporf Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emafled to: <br /> Jack Bronczyk -jar_k.broncrykf�krauzarxierson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ��� Loosbrock, Tom , 3659 ', <br /> I.D.No.: 1 3 <br /> Providing engineering and environmental solutions since 1957 <br />