My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> �' 8.15 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br /> � If required by Engineer, Contractor shall promptly, without cost to Owner and as specified by <br /> � Engineer, either correct any defective Work, whether or not fabricated, installed or completed, or, <br /> if the Work has been rejected by Engineer, remove it from the site and replace it with non-defective <br /> � Work. <br /> � 8.16 ACCEPTANCE OF DEFECTIVE WORK <br /> If, instead of requiring correction or removal and replacement of defective��Iork, Owner (and, priar <br /> � to Engineer's recommendation of final payment, also Engineer) prefers to accept it, Owner may do <br /> so. In such case, if acceptance occurs prior to Engineer's recommendation of final payment, a <br /> Change Order shall be issued incorporating the necessary revisions in the Contract Documents, <br /> � including appropriate reduction in the Cantract Price; or, if the acceptance occurs after such <br /> recommendation, an appropriate amount shall be paid by Contractor ta Owner. <br /> L8.17 OWNER MAY STOP THE WORK <br /> if the Work is defective,or Contractor fails to supply sufficient skilled workmen or suitable materials <br /> � or equipment, Owner may order�ontractor to stop the Work, or any portion thereof, until the cause <br /> for such order has been eliminated; however,this right of Owner to stop the Work shall not give rise <br /> to any duty on th�p�itt af OwnPr to exercise this right for the benefit of i antractor or any other party. <br /> � . 8.18 OWNER MAY CORRECT DEFECTIVE WORK <br /> � If Contractor fails within a reasonable time after written notice of Et�gineer to proceed to correct the <br /> defective Work or to rernode and replace rejected�1Vork as required by Engineer in accordance with <br /> � Paragraph 8.15, or if Contractor fails to perform the Work in accordance with the Contract <br /> Dacuments (including any requirements of the progress schedule), Owner r�ay, after sever: clays' <br /> written notice to Contractor, and Contractor's Surety, correct and remedy any such deficiency. In <br /> � exercising its rights under this paragraph, Owner shall proceed expeditious3y. To the exterat <br /> necessary to complete conective and remediai action,Qwner may exclude Contractor from all or pat-� <br /> of the site, take possession of all or part of the Work, and suspend Cantractor's services r�lated <br /> � thereto, take possession of Contractor's tools, appliances, construction equipment and machinery at <br /> t�� s�e-and_incorpora�e in the Work all materials and equipment stored at the site or for which <br /> Owner has paid Contractor but whi�t►are sto�et�elsewh�re.__Contractor shall allow Owner, Owner's <br /> � representatives, agents and employees such access to the site as may be necessa�y to e�ak��� ��uner <br /> to exercise its rights un�er this paragraph. All direct and indirect costs of Owner in exercising such <br /> rights shall be charged against Contractor in an amount reviewed by Engineer, and such amounts <br /> � sha11 be deducted from the Contract Price. Such direct and indirect casts shall include, in particular <br /> but without limitation, compensation for additional professional services required and all costs of <br /> repair and replacement of work of others destroyed or damaged by correction, removal or <br /> � replacement of Contractor's defeetive Work. Contractor shall not be allowed an extension of the <br /> Contract Time because of az�y delay in performance of the Work attributable to the exercise by <br /> � C�s�ner of Owner's rights hereunder. <br /> �,e�i eraUS pacs;Condtns.gen <br /> � G 1996 4�onesVczc,Rosene. <br /> .'.nde��i�.:&Associate�.����. -33 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.