My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs for garage entrance canopy
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2700 Kelley Parkway- 33-118-23-12-0007 - Public works
>
Misc
>
Specs for garage entrance canopy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:46 PM
Creation date
3/28/2017 10:42:57 AM
Metadata
Fields
Template:
x Address Old
House Number
2700
Street Name
Kelley
Street Type
Parkway
Address
2700 Kelley Parkway
Document Type
Misc
PIN
3311823120007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> � 3.6 CONTRACT'TIME <br /> ' The Contractor shall camplete, in an acceptable manner, all of the Work contracted for in the time <br /> stated in the Contract Documents, subject only to extension for unforeseeable delays above and <br /> beyond the control of the Contractor and his Subcontractors and without their fault or negligence. <br /> ' �JVritten notice of the Contractor's claim for such extension shall be given within ten (10) days of the <br /> occurrence of the event giving rise to the claim; otherwise the claim shall be waived. <br /> , 3.7 SCHEDULE OF COMPLETION <br /> The Contractor shall submit,at such time as may reasonably be requested by the Engineer, schedules <br /> , which shall show the order in which the Contractor proposes to carry on the Wor�C, with dates at <br /> which the Contractor will start the several parts of the Work and estimated dates of completion of <br /> , the several parts. <br /> 3.8 COMPUTATION OF TIME <br /> ' When any period of time is referred to in the Contract Documents by days, it shall be computed to <br /> exclude the first and include the last day of such period. ff the last day of any such period falls on <br /> ' a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such <br /> day shall be omitted from the computation. <br /> ' 3.9 LIOUIDATED DAMAGES <br /> 3.9.1 Time is the essence of the contract. The Contractor thereby agrees that the �wner will be <br /> ' entitled to liquidated damages for failure on the part of the Contractor to complete the Work within <br /> the time limits provided for in the Contract Documents. <br /> , 3.9.2 �hould the Contractor fail to complete the project on or before the s�ecified date, liquic;�.��ci <br /> damages in the amount specified in the Special Provisions shall be deducted from any monies due <br /> , or coming due to the Contractor or shall be paid to the Owner not as a penalty but as liquidated <br /> damages for each and every calendar day that the contract sha11 remain uncompleted after the <br /> specified date for Completion. Liquidated damages are specified herein because of the extreme <br /> ' difficaltiy of ascertainirt� �nd e.stablishing the actual damages which the Ov�rner would sustain. <br /> ' SECTION 4 <br /> CONTRACT I��CUMENTS: INTENT AND REUSE <br /> ' 4.1 IN�'ENT OF CONTRACT DOCUMENTS <br /> ' 4.1.I The Contract Documents comprise the entire Agreement b�tween Owner and Contractor <br /> conceyning the Work. They rrlay be altered only by a written Change �Jrder. <br /> ' <br /> GenetaU��r es/4�:r«utns.gere <br /> �J !i9E Baeees¢roo,Kosene, <br /> � sti���rGk�.����c:i�'.�s:9rc. -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.