Laserfiche WebLink
SECTION 16400-SERVICE AND DLSTRIBUTION <br /> A. PROJECT INCLUDES � <br /> 1. Electrical service and distribution including service entrance,switchboards,low-vol ge power <br /> switchgear,grounding,transformers,busways,panelboards,overcurrent protective vices. <br /> 2. Service and Distribution Requirements: The incoming service shall be rated at 100 ps, <br /> single phase,3 wire,either 208 VAC or 240 VAC. <br /> B. PRODUCTS <br /> 1. Service Entrance: <br /> a. Circuit Breakers shall be rated for a minimum interrupting capacity of 10,000 I.C. <br /> b. Fuses: Time-delay,fast-acting,cun�ent-limiting types. <br /> c. Meter Sockets: Acceptable to local utility company. <br /> d. Switches: Heavy-duty safety switches with NEMA Type 1 enclosure. <br /> 2. Grounding: <br /> a Grounding Equipment: UL 467;copper conductors;NEC Table 8 wire and cabl <br /> conductors;connectors. <br /> b. Gmunding Electrodes: Copper-clad steel ground rods;copper plate electrodes. <br /> END OF SECTION <br /> CNS/C1S WEST COMMUNICATIONS SERVICE AND DIS UTTON <br /> SIvflvIA NO.96419.16 16400-1 1 DEC.% <br />