Laserfiche WebLink
1.07 QUALITY ASSURANCE, continued <br /> C. Manufacturer and Installer : Company specializing in manufacturing aluminum <br /> glazing systems with minimum three years documented experience. <br /> 1.08 DELIVERY, STORAGE, AND PROTECTION <br /> A Section 01600 - Material and Equipment: Transport, handle, store, and protect <br /> produ�ts. <br /> B. Handle Products of this section in accordance with AAMA- Curtain Wall Manual <br /> #10. <br /> C. Protect finished aluminum surfaces with [wrapping] [strippable coating]. Do not <br /> use adhesive papers or sprayed coatings which bond when exposed to sunlight or <br /> � weather. <br />� 1.09 WARRANTY <br /> A. Section 01700-Contract Closeout. <br />�� B. CorreGt defective Work within a five year period after Substantial Completion. <br /> ,;� C. Warranty: Include coverage for complete system for failure to meet specified <br /> � requirements. <br /> � D. Provide five yeaz manufacturer warranty for glazed units. <br /> ;� <br /> c3�� PART 2 PRODUCTS <br /> � 2.01 bZANUFACTURERS <br /> :u�� <br /> A. Doors <br /> 1. CMI Architectaral P�roduds,InG -351 Enbance system <br /> �.� <br /> 2. Kawneer(System similar to CM� <br /> 3. Warisau Mdals Caporat�on �• •, <br /> r.. <br /> B. Storefront <br /> � 1. CMI Architectura[Prorluds, In� —C75'System <br /> 2. Kar�neer(Systene sinrilar to CM�—NiICORE syste►n <br /> C. Section 01300- Submittats: Product options and substitutions. <br /> 2.02 MATERIALS <br /> uminum: ASTM B22 L <br /> B. Sheet Aluminum: ASTM B209. <br /> C. Fasteners: ASTM A 164 <br />��� <br /> 2.Q3 COMPONENTS <br /> A. Frame: 2 x4 inch nominal dimension;thermally broken with interior tubular section <br /> � insulated from exterior; flush glazing stops; drainage holes; internal weep drainage <br /> �..� system. <br /> ; <br /> � Division 8-Section 08410 <br /> �;� <br /> Page 3 of 6 <br /> � <br /> , <br /> s <br />