Laserfiche WebLink
��� <br /> PART 3 EXECUTION <br /> 3.1 EXAMINATION <br /> A. Verify that wall openings are ready to receive work and opening dimensions and <br /> tolerances are within specified limits. <br /> B. Beginning of installation means acceptance of existing surfaces. <br /> �� 3.2 PREPARATION <br /> A. Prepare opening to permit correct installation of door unit to perimeter air and <br /> vapor barrier seal. <br /> B. Apply sealer to wood frame. <br /> � C. Verify that electric power is available and of the conect characteristics. <br /> �� <br /> 3.3 INSTALLATION <br /> A. Install door unit assembly in accordance with manufacturer's instructions. <br /> �� B. Anchor assembly to wall construction and building framing without distortion or <br /> stress. <br /> C. Securely brace door tracks suspended from structure. Secure tracks to structural <br />�L� members only. Provide for sound isolation. <br /> D. Fit and align door assembly including hardware, level and plumb, to provide <br /> smooth operation. <br /> .,,� E. Coordinate installation of electrical service. Complete power and control wiring <br /> from disconnect to unit components. <br /> F. Coordinate installation of sealants and backing materials at frame perimeter as <br /> ����� specified in Section 07900. <br /> G. Install perimeter trim and closures. <br /> H. Fit and align door assembly including hardware, level and plumb, to provide <br /> �� smooth operation. <br /> I. Coordinate installation of electrical service. Complete power and control wiring <br />��� from disconnect to unit components. <br /> J. Coordinate installation of sealants and backing materials at frame perimeter as <br /> K. Install perimeter trim and closures. <br /> 3.4 ADNSTING <br /> A. Adjust door assembly to smooth operation, according to Manufacturer's <br /> instructions. <br />�� <br />�; <br /> Division 8-Section 08360 <br /> Page 3 of 4 <br /> �� <br />