Laserfiche WebLink
PART 3 EXECUTION <br /> 3.O 1 INSTALLATI4N <br /> A. Install doors in accordance with SDI-100 and DHI. <br /> B. Coordinate installation of glass and glazing. <br /> C. Coordinate installation of doors with installation of frames specified in Section <br /> 08112. <br /> D. Touch-up factory finished doors. <br /> 3.03 ERECTION TOLERANCES <br /> = A. Maximum Diagonal Distortion:l/16 inch measured with straight edge, corner to <br /> �"%' corner. <br /> �� 3.04 ADJUSTING <br /> A. Section 01700—Contract Closeout: Adjusting installed work. <br /> B. Adjust door for smooth and balanced door movement. <br />�,� <br /> � END OF SECTION <br />�� <br /> � <br /> � <br />� <br />� <br /> , <br /> � <br /> � <br /> � <br /> � <br /> ,� Division 8—Secdon 08111 <br /> Page 3 of 3 <br /> � <br /> ;,� <br />