Laserfiche WebLink
� <br /> ¢;,,. <br /> 2.01 MATERIALS, continued <br /> C. Staples: Steel wire; type and size to suit application. <br /> D. Tape: 3M#8086 seam tape. <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verify site conditions under provisions of Section 01100. <br /> B. Verify that substrate, adjacent materials, and insulation are dry and ready to receive <br /> insulation. <br /> 3.02 1NSTALLATION <br /> � <br /> A. Install insulation manufacturer's instructions. � <br /> B. Install in interior walls (where indicated) and ceiling spaces without gaps or voids. <br /> Do not compress msulation. <br /> C. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids. � <br /> D. Fit insulation tight in spaces and tight to exterior side of inechanical and electrical <br /> services within the plane of insulation. <br /> E. Install with factory applied vapor retarder membrane facing warm side of building <br /> spaces. Lap ends and side flanges of inembrane over framing members. �� <br /> F. Staple or nail facing flanges in place at maximum 6 inches oc. <br /> G. Tape seal butt ends, lapped flanges, and tears or cuts in membrane. � <br /> H. Wood Framing: Place vapor retarder on warm side of insulation by stapling at 6 <br /> inches oc. Lap and seal sheet retarder joints over member face. <br /> � <br /> END OF SECTION <br /> � <br /> � <br /> � <br /> � <br /> Division 7-Section 07213 � <br /> Page 2 of 2 <br /> E� <br />