My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.02 PRODUCTS <br /> A. Rigid Insulation: <br /> 1. "�ertifoam"Drainage Boazd,#25 or#40, 2"thick <br /> 2. "Cerlite" System Boazd, 2"thick. <br /> B. Adhesive: Type recommended by insula.tion manufacturer for application. <br /> 2.03 ACCESSORIES <br /> A. Sheet Vapor Retarder: Specified in Section 07191. <br /> PART 3 EXECiTTION - <br /> �. <br /> 3.01 E�:AMINATION <br /> A. Verify that substrate, adjacent materials, and insulation boards are dry and ready to <br /> receive insulation and adhesive . � <br /> B. Verify substrate surface is flat, free of irregularities, materials or substances that <br /> may impede adhesive bond . <br /> C. Verify site conditions under provisions of Section 01100. ,y� <br /> 3.02 IN$TA�,LATION -FOUNDATION PERIlI�TER <br /> A. Insta.11 boards on foundation wa11 perimeter, vertically or horizontally. a� <br /> 1. Place boards in a method to maximize contact bedding. - <br /> 2. Stagger side and end joints. � <br /> 3. Butt edges and ends tight to adjacent boazd and to protrusions. <br /> B. Cut and fit uzsulation tight to protrusions or mterruptions to the insulation <br /> 3.03 IN��'ALLAT`ION—IJNDER CONCRETE SLABS(at 1�Floor porches) � <br /> A. Place insulation under slabs on grade after base for slab has been concealed. <br /> B. Cut and fit insulation tight to protrusions or interruptions to the insulation plane. <br /> C. Prevent insulation from being displaced or da.maged while placing vapor retarder � <br /> and placing slab. <br /> 3.04 PROTECTION OF FINISHED WORK <br /> A. Protect finished Work under pmvisions of Section 01200. <br /> B. Do not pernvt work to be damaged prior to covering insulation. <br /> 3.05 SCHEDULES <br /> A. Perimeter Insulation: Extruded polystyrene with drainage channels. <br /> ;. <br /> END pF SECTION „�� <br /> Division 7—Section 07212 <br /> Page 2 of 2 <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.