Laserfiche WebLink
PART 3 EXECLJTION <br /> 3.1 EXAn�IINATION <br /> A Verify that supports and openings are ready to receive trusses. <br /> 3 2 PREPARATION <br /> A. Coordinate placement of bearing and support items. <br /> 3.3 ERECTION <br /> A. Install trusses in accordance with manufacturer's instructions and TPI BWT-76. <br /> B. Set members level and plumb, in conect position. <br /> C. Make provisions for erection loads, and for sufficient temporary bracing to <br /> � maintain shucture plumb, a.nd in true alignment until completion of erection and <br /> � installation of permanent bracing. <br /> D. Do t�ot field cut or alter structural members without approval of <br /> Archi�ect/Engineer. <br /> E. Place hea.ders and supports to&ame openings. <br /> � F. Frame openings between trusses with lumber in accordance with Section 06112 and <br /> 06114. <br /> �� G. Coordinate placement of sheathing with work of this section. <br /> �,. <br /> H. After erectian,touch-up damaged surfaces with primer consistent with shop coat. <br /> � <br /> END OF SECTION <br /> � <br /> � <br /> �;�� . <br /> � <br /> �� <br /> Division 6-Section 06193 <br /> Page 3 of 3 <br /> wT� <br />