Laserfiche WebLink
(� <br /> i;y <br /> 3.03 APPLICATION, continued <br /> D. Apply each coat of paint slightly darker than preceding coat unless otherwise <br /> approved. <br /> E. Sand wood lightly between coats to achieve required finish. <br /> F. Vacuum clean surfaces free of loose particles. Use tack cloth just prior to applying <br /> next coat. <br /> G. Allow applied coat to dry before next coat is applied. <br /> H. Where clear finishes are required, tint fillers to match wood. Work fillers into the <br /> grain before set. Wipe excess from surface. <br /> I. Prime concealed surfaces of interior woodwork with primer paint. <br /> J. Prime concealed surfaces of interior woodwork scheduled to receive stain or � <br /> varnish finish with gloss varnish reduced 25 percent with mineral spirits. <br /> 3.04 FINISHING MECHAl�IICAL AND ELECTRICAL EQUII'MENT �� <br /> A. Remove unfinished louvers, grilles, covers, and access panels on exposed <br /> mechanical and electrical components and paint separately. <br /> B. Prime and paint insulated and exposed pipes, conduit, boxes, insulated and exposed � <br /> ducts, hangers, brackets, collars and supports, except where items are prefinished. <br /> C. Paint exposed conduit and electrical equipment occurring in finished areas. <br /> D. Paint both sides and edges of plywood backboards for electrical and telephone -�" <br /> equipment before installing equipment. <br /> E. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and � <br /> fittings removed prior to finishing. <br /> 3.05 CLEANING � <br /> A. Clean work under provisions of Section 01700. <br /> B. Collect waste material which may constitute a fire hazard, place in closed metal <br /> containers and remove daily from site. � <br /> 3.06 SCHEDULE - SHOP PRIlVIED ITEMS FOR SITE FII�tISHING <br /> A. Metal Fabrications : Stair and components, handrails and guardrails. � <br /> 3.07 SCHEDULE - EXTERIOR SURFACES <br /> A. Pavement Markings: � <br /> 1. One coat of traffic paint, white. <br /> B. Steel -Unprimed <br /> 1. One coat of latex primer. � <br /> 2. Two coats of latex enamel, semi-gloss. <br /> D. Steel - Shop Primed: <br /> 1. Touch-up with zinc chromate primer. � <br /> 2. Two coats of latex enamel, semi-gloss. <br /> Division 9—Section 09900 � <br /> Page 4 of 5 <br /> � <br />