My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�� <br /> iJ; <br /> 1.06 EXTRA MATERIALS <br /> A. Furnish under provisions of Section 01700. <br /> B. Label each container with color, type, texture, room locations, and in addition to <br /> the manufacturer's label. <br /> PART 2 PRODUCTS <br /> 2.01 MANUFACTURERS <br /> A. Manufacturers -Paint <br /> 1. Pratt and Lambert, Sherwin Williams, Pittsburgh, or approved equal. <br /> 2. <br /> 02 MATERIALS � <br /> A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a soft <br /> paste consistency, capable of being readily and uniformly dispersed to a � <br /> homogeneous coating; good flow and brushing properties; capable of drying or <br /> curing free of streaks or sags. <br /> B. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other � <br /> materials not specifically indicated but required to achieve the finishes specified, of <br /> commercial quality. c� <br /> C. Patching Materials: Latex filler. <br /> PART 3 EXECUTION �� <br /> 3.01 EXAMINATION <br /> A. Verify site conditions under provisions of Section 01100. � <br /> B. Verify that surfaces are ready to receive work as instructed by the product <br /> manufacturer. <br /> C. Examine surfaces scheduled to be finished prior to commencement of work. � <br /> Report any condition that may potentially affect proper application. <br /> D. Test shop applied primer for compatibility with subsequent cover materials. <br /> �. Measure moisture content of surfaces using an electronic moisture meter. Do not <br /> apply finishes unless moisture content of surfaces are below the following <br /> maximums: <br /> 1. Plaster and Gypsum Wallboard: 12 percent. <br /> 2. Masonry, Concrete, and Concrete Unit Masonry: 12 percent. <br /> 3. Interior Wood: 15 percent, measured in accordance with ASTM D2016. <br /> 4. Exterior Wood: 15 percent, measured in accordance with ASTM D2016. <br /> � <br /> � <br /> Division 9—Section 09900 <br /> Page 2 of 5 �' <br /> ,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.