Laserfiche WebLink
3.03 1NSTALLATION- SHEET FLOORING <br /> A. Install in accordance with manufacturer's instructions. <br /> B. Spread only enough adhesive to permit installation of materials before initial set. <br /> C. Set flooring in place, press with hea.vy roller to attain full adhesion. <br /> D. Lay flooring with joints and seams parallel to building lines to produce <br /> symmetrical tile pattern. <br /> E. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances <br /> to produce tight joints. <br /> F. Install feature strips where indicated. Fit joints tightly. <br /> 3.04 CLEANING <br /> `� A. Clean work under provisions of 01700. <br /> B. Remove access adhesive from floor, base, and wall surfaces without damage. <br />� ' C. Cleaq seal, and wax floor and base surfaces in accordance with manufacturer's <br /> instructions. <br />�� 3.05 PROTECTION OF FlI�TISHED WORK <br /> A. Protect finished Work under provisions of Section 01500. <br /> B. Prohibit traffic on floor finish for 48 hours after installation. <br />�� <br />�� END OF SECTION <br /> � <br />�� <br />�� <br /> 1 <br /> ,� Division 9—Section 09650 <br /> Page 3 of 3 <br />,� <br />