My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 1.06 SEQUENCING, continued <br /> B. Install acoustical units after interior wet work is dry. <br /> 1.07 EXTRA MATERIALS <br /> A. Furnish under provisions of Section 01700. <br /> B. Provide extra tile to Owner. <br /> PART 2 PRODUCTS <br /> 2.01 MANUFACTURERS - SUSPENSION AND TILE SYSTEM <br /> A. Armstrong Contract Interiors — Tile Angled Tegular Cirrus, No. 584, Grid: 15/16" � <br /> exposed Prelude Crrid. White Color. � <br /> B. Substitutions: Under provisions of Section 01600. <br /> �� <br /> 2.02 SUSPENSION SYSTEM MATERIALS <br /> A. Non-fire Rated Grid: ASTM C635, intermediate duty, exposed T; components die <br /> cut and interlocking. � <br /> B. Grid Finish: White color. <br /> PART 3 EXECUTION � <br /> 3.01 EXAMINATION r� <br /> A. Verify site conditions. <br /> B. Verify that layout of hangers will not interfere with other work. <br /> 3.02 INSTALLATION-LAY-1N GRID SUSPENSION SYSTEM �� <br /> A. Install suspension system in accordance with ASTM C636 and as supplemented in <br /> this section. � <br /> B. Install system in accordance with ASTM E580. f <br /> C. Lay out system to a balanced grid design with edge units no less than 50 percent of <br /> acoustical unit size. � <br /> D. Install after major above ceiling work is complete. Coordinate the location of <br /> hangers with other work. <br /> E. Hang suspension system independent of walls, columns, ducts, pipes and conduit. <br /> Where carrying members are spliced, avoid visible displacement of face plane of <br /> adjacent members. _ <br /> F. Where ducts or other equipment prevent the regular spacing of hangers, reinforce <br /> the nearest affected hangers and related carrying channels to span the extra � <br /> distance. <br /> G. Do not eccentrically load system, or produce rotation of runners. <br /> �. <br /> Division 9—Section 09511 � <br /> Page 2 of 3 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.