Laserfiche WebLink
2.06 ACCESSORIES <br /> A. Membrane: Waterproof inembrane. As recommended by the TCA. <br /> B. Reinforcing Mesh: 2 x 2 inch size weave of 16/16 wire size; welded fabric, <br /> galvanized. <br /> C. Thresholds: Marble type. <br /> 2.07 GROUT MIX <br /> A. Mix and proportion pre-mix setting bed and grout materials in accordance with <br /> TCA Handbook. <br /> PART 3 EXECUTION <br /> ,� 3.01 EXAMINATION � <br /> A. Verify substrate under provisions of Section 01039. <br /> B. Verify that surfaces are ready to receive work. <br /> �� <br /> 3.02 PREPARATION <br /> A. Protect surrounding work from damage or disfiguration. <br /> �y� B. Vacuum clean surfaces and damp clean. <br /> C. Seal substrate surface cracks with filler. Level existing substrate surfaces to <br />�� acceptable flatness tolerances. <br /> � D. Apply sealer conditioner to substrate surfaces in accordance with adhesive <br /> manufacturer's instructions. <br /> �� 3.03 INSTALLATION- THINSET METHOD <br /> A. Install adhesive tile, thresholds, and grout in accordance to TCA Handbook. <br /> �� B. Allow tile to set for a minimum of 48 hours prior to grouting. <br /> �:,'�� C. Grout tile joints. <br /> D, Apply sealant to junction of tile and dissimilar materials and junction of dissimilar <br /> �;: � planes. ' <br /> 3; <br /> 3.04 INSTALLATION-MORTAR BED METHOD <br /> . nsta mortar e , ti e, t es o , an grou m accor ance wi an o0 <br /> Method. <br /> B. Install cleavage membrane; lap and seal watertight, edges and ends. <br /> C. Sound tile after setting. Replace hollow sounding units. <br /> D. Allow tile to set for a minimum of 48 hours prior to grouting. <br /> E. Crrout tile joints. <br /> � F. Apply sealant to junction of tile and dissimilar materials and junction of dissimilar <br /> �.. <br /> �-�' planes. <br /> 1 <br /> � Division 9—Secdon 09306 <br /> Page 3 of 4 <br />�� <br />