Laserfiche WebLink
2.02 FII�IISHES <br /> A. Finishes: Bright Brass. <br /> PART 3 EXECUTION <br /> 3.01 EXAIVIINATION <br /> A. Verify that doors and frames are ready to receive work and dimensions are as <br /> indicated on shop drawings <br /> 3.02 INSTALLATION <br /> A. Install hardware in accordance with manufacturer's instructions. <br /> s B. Use templates provided by hardware item manufacturer. <br /> � 3.03 ADNSTING <br /> A. Adjust hardware for smooth operation. <br /> 3.04 PROTECTION OF FII�TISHED WORK <br /> A. Do not permrt ad�acent work to damage hardware or fimsh. <br /> � 3.05 SCHEDULES <br /> ' `� A. Grou 1: for Aluminum Ent S stem b Door Su lier Grou 2 for sin le doors <br /> P rY Y , Y PP � P g ) <br />�� 2 Pulls <br /> � 2 Push Bars <br /> 6 Butts <br />� 1 Mullion <br /> 2 Cylinders <br /> 2 Closers <br />� 1 Threshold <br /> � 2 Sweep <br /> 1 Electric Strike <br /> 1 Weatherstripping <br /> B. Group 2: See Group 1 <br /> C. Group 3 (for 1 hour stair enclosures) <br /> us <br /> 1 Closer <br /> 1 Wall Stop <br /> 1 Smoke Gasket <br /> 1 Lever Passage Set (Exit Function) <br /> �. <br />�� Division 8—Section 08710 <br /> Page 3 of 5 <br />