My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual-2005
Orono
>
Property Files
>
Street Address
>
K
>
Kelley Parkway
>
2670 Kelley Parkway - 33-118-23-12-9999 Unit #100-common areas of condo bldg.
>
Misc
>
Project manual-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:46:57 PM
Creation date
3/27/2017 1:41:32 PM
Metadata
Fields
Template:
x Address Old
Address
2670 Kelley Pwky
Document Type
Misc
PIN
3311823129999
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Section 01100: General Requirements: Verification of existing conditions before <br /> starting work. <br /> B. Verify dimensions,tolerances,and method of attachment with other work. <br /> C. Verify wall openings and adjoining air and vapor seal materials are ready to receive <br /> work of this Section. <br /> 3.02 INSTALLATION <br /> A. Instail wa11 system in accordance with manufacturer's instructions and AAMA - <br /> Meta1 Curtain Wall, Window, Store Front and Entrance - Guide Specifications <br /> Manual . <br /> �� B_ Attac� to structure to permit sufficient adjustment to accommodate construction <br /> tolerances and other irregularities. <br /> �, C. Provide alignment attachments and shims to permanently fasten system to building <br /> :� structure. <br /> D. Align assembly plumb and level, free of warp or twist. Maintain assembly <br /> dimensional toterances, atigning with adjacent work. <br />�� E. Provide thermal isolation where components penetrate or disrupt building <br /> �= insulation. <br /> F. Install flashings. Turn up ends and edges; seal to adja.cent work to form water tight <br />�:� �' <br /> G. Coordinate attachment and seal of perimeter air and vapor batrier materials. <br /> H_ Pack fibrous insulation in shim spaces at perimeter of assembly to maintain <br />�� continµity of thermal barrier. <br /> I. Set thresholds in bed of mastic and se�ure. <br /> � J. Install hardware using templates provided. <br /> � K_ Install glass according to ma.nufacturer's instiuctions. <br /> .� <br /> L. Install perimeter sealant in accordance with Section 07900. <br /> `� 3.03 ERECTION TOLERANCES <br /> A. In accordance with manufacturer's insttuctions and AAMA - Metal Curtain Wal <br /> , re ron an n ce- e Specifications Manual _ <br /> 3.04 ADJUSTIl�iG <br /> A. Section 01700-Contract Closeout: Adjusting installed work. <br /> B. Adjust operating hardware for smooth operation, <br /> °� <br /> � <br /> 'e Division 8-Section 08410 <br /> `J`j� Page 5 of 6 <br />���� <br />
The URL can be used to link to this page
Your browser does not support the video tag.