Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson I� � w <br /> Sent: Friday, June 21, 2013 9:27 AM �,�v �n� <br /> To: 'Steve Sexton' � n T�V��b+ <br /> Cc: Melanie Curtis � `W � d <br /> Subject: 3625 Jacobs Mill Road/2013-00426 r� <br /> �'�j� LJ <br /> Steve <br /> Our engineer has reviewed the revised plans dated 6/17/13 and has additional comments (listed below). Please address <br /> these comments.The survey should clearly indicate the delineated wetland edge and the date and source of the <br /> delineation. <br /> Also, I understand Brandon Wisner from the MCWD contacted you yesterday to update you about their erosion control <br /> permit, but that their review/approval of the wetland delineation is not yet complete. <br /> The pool plans and application was dropped off this morning. If you have any questions, please don't hesitate to contact <br /> me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway ' Orono MN � 55356(physical addressJ <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ <br /> ?li' 952.249.4620 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 20 through Friday,August 30,2013) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Thursday,July 4, 2013 <br /> Melanie, <br /> As requested I have reviewed the Building Permit Application for 3625 Jacobs Mill Road, Permit Number 2013-00426. <br />, Based on my review, I offer the following comments for your consideration: <br /> 1. The Wetland Delineation shown on the survey should be labeled to indicate that it corresponds with the <br /> Wetland Delineation Report dated May 24, 2013, completed by Kjolhaug Environmental Services. <br /> 2. The proposed pool deck is located 38' from Wetland 1, which meets the required setback. <br /> 3. The 994 contour on the west side of the pool should be adjusted to the north to match the proposed bottom of <br /> wall elevation of 994 next to the proposed steps. <br /> 4. The area on the south side of the garage appears to be very flat. Spot elevations should be shown to indicate <br /> how positive drainage will be provided between the 1000' contours. <br /> 5. The propose driveway has a maximum grade of approximately 10%, which ends at the edge of the road. A <br /> relatively flat landing area should be provided at the end of the driveway. <br /> 1 <br />