Laserfiche WebLink
. <br /> F�riday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday, September 2, 2013 <br /> 1. Are the concrete walls on the south part of the house being replaced as part of this project? If they are to be <br /> included, an engineer will need to sign plans and specifications because the tiered wall system exceeds 4' in <br /> height and are not separated by more than 2x the height of the taller wall. <br /> 2. The proposed boulder wall on the south side of the property is very close to the 5' required setback from the <br /> property line. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> 2 <br />