Laserfiche WebLink
� ► <br /> , <br /> . � <br /> ?. Within 5 working days of superstructure removal,a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris,with any excavation filled with earth level with <br /> the adjacent ground elevation(except when such excavation is to be used as part of a new <br /> bu�"ding and such new building is actnally under construction). <br /> 8. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses,including attorney fees,against the City,its agents,employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents,subcontractors or assigns. <br /> 9. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks must <br /> be pumped,crushed and filled with native soils. An inspection is required after the tanks aze <br /> pumped and before the tanks aze crushed and filled. <br /> � PERNIIT TYPE AND FEE CALCULATION <br /> �_ $50.00-Principal Structure <br /> $30.00 -Accessory Structure <br /> 1. Subtotal of above permit requested $ <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE(add lines 1-2 above) $ <br /> The undersigned hereby applies to the City of Orono for issuance of a Demolition Permit,agrees to <br /> do all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> hlinnesota,and certifies that all statements made on this application are complete,true and correct. <br /> APPLICANT'S SIGNATURE: Date: <br /> OWNER'SSIGNATURE: G.�� • •V. Date: <br /> APPROVED BY: Date: //• / c/• 4 Z. <br />