Laserfiche WebLink
APR-2 -2003 11�23 MINNEHAHA CREEK WATERSHED 6124710682 P.62/02 <br /> Minneh�ha Creek . W�tershed District <br /> . Improving Quadiry of T�ater, Qualicy of Life <br /> Esrablxrhed in 1967 <br /> M��; April 24,20U3 <br /> 18202 Minne nka HNd., Jerry Grundhofer <br /> Deephaven, �gi Grundhofer Construction Company, Inc. <br /> 1 2005-1 65'h Street N <br /> Phone:(952) 1-05so Marine on St. Croix, MN 55047 � <br /> Fax:(952)471 82 <br /> Dear Mr. Grundhofer: ' <br /> Ema1: RE: Permit#03-020: 35�9_IW Place, Orono <br /> adrqln�minn reek.org � � <br /> The additional application material was received by the Minnehaha Creek Watershed District <br /> Web Site: (MCWD)on Apr�23,2003. The letter dated April 21, 2003 stated an application was sent in <br /> wwwminneha creek,org January. Upon ceipt of the original application which was incomplete, a series of letters <br /> requesting add�iPnal information in the fonn of a site plan with erosion cohtrol measures indicated <br /> were forwarded to Gundhofer Construction. This includes the location of silt fence and the <br /> temporary constru�tion entrance as gravel or existing bltuminaus. This required information is yet <br /> absent from the materials sent to MCWD. I have enclosed the original site plan submitted with the <br /> required erosion control measures indicated. Ta cornplete your permit applieation,all that Is <br /> Board ot Man needed is signature,date and retum to the MCWD, <br /> P�,��.�I; The letter dated April 21,2003 also states that the driveway cannot be graveled until finish grade of <br /> the yard, road restrictions are removed and sidewalks are i�stalled. The reauirement of a gravel <br /> James Calkins driveway is established as a temporarv construction entranae to contain sediment on site and <br /> Lance Fi�er reduce silt in the street and storm sewer. This is a requirement for aII erosion control permits <br /> required throughout the district despite raad restrictions or finished grade. An altemative would be <br /> Manlca Gross to clean the street e�dav followina construction activitv at entrance to the site, Casco Circle. <br /> scoitThomes All future projects started by Grundhofer Const�uction before an MCWD permit has been issued <br /> Richard Miller and received will be assessed a$100.00 After-the-fact permit fee. Submittal of application <br /> Robert Schroeder materials does not guaranlee permit issuance. Working without a parmit where one is required is <br /> in violation of MCWD Rules and is a misdemeanor subJect to penalty by law. <br /> To avoid formal enforcement action from the Minnehaha C�eek Wate�shed District which may <br /> include fees for additional inspections and legal costs, and the delivery of a Stop Work Order, <br /> please retum the perrnit material and implement changes to the driveway by May 9, 2003.Thank <br /> you fior your immediate attention to this matter,�ou have anv auestions �lease call me at (9521 <br /> 4 1-0590. � <br /> Sincerely, <br /> ��i���7'�-""'�. <br /> Angela Hammers <br /> District Representative <br /> Enclosure: Site plan with erosion control measures indicated- (to be signed, dated and <br /> retumed) <br /> Cc: Lyle Oman, City of Orono <br />�RInWO en rooyded peper coti�ninp � <br /> el Isw yo7i poel eansuner waeie. <br /> TOTAL P.02 <br />