Laserfiche WebLink
, ��-, <br /> � <br /> �— <br /> �� �� <br /> ��� � <br /> ;i , �.t�� � � CITY of ORONO <br /> '��`� � ;y � r�� F, Municipal off'ices <br /> �:� � �� - �, � <br /> ���,t \����< �,`e���G Street Addross: Mailin�Addreu: <br /> �. �, <br /> ��'9lr�KQ'g' 2750 Ketley Parkway P.O. Box 66 <br /> \ '�-- Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> November 3 , 1999 <br /> James Beauchaine <br /> 460 East Long Lake Road <br /> Wayzata, MN 55391 <br /> Dear Project Area Residents: <br /> The East Long Lake azea was included in the recently completed Metropolitan Urban Service Area <br /> (MUSA)expansions. This MUSA expansion area included ten existing neighborhoods with smaller <br /> lot sizes in which the continued use of septic systems could be problematic. Sanitary sewer has <br /> already been installed in seven of these neighborhoods with two additional projects planned for next <br /> summer. <br /> We would like to begin the process for a possible sanitary sewer project to serve the East Long Lake <br /> neighborhood. This would be an assessment project with the benefitting property owners being <br /> assessed the project costs. <br /> A preliminary cost estimate has been completed for this project. The study lists two possible options <br /> for the provision of sanitary sewer. One option is for gravity sewer with a City owned lift station. <br /> This is the more expensive option because of the need for deeper 8" gravity lines and the need for <br /> complete reconstruction of the street. The estimated cost for the gravity sewer option is$31,000 per <br /> unit for ten residential units and one unit for the city park. A service stub would be provided out to <br /> the property line and the property owners are then responsible for their own connection to the stub <br /> at the property line. <br /> The other option is for a pressure sewer system in which a small diameter forcemain would be <br /> installed in the street. The property owners are then responsible for the purchase, installation, <br /> operation,and maintenance of their own residential grinder pump station to pump into the forcemain. <br /> A City owned lift station is not required for this option. This option is less expensive because a <br /> smaller diameter forcemain can be installed at a shallower depth and complete street reconstruction <br /> is not required. The estimated cost for this option is $13,700 per unit. <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />