Laserfiche WebLink
0 <br /> c� � 0 a�li �g '>,�i� < <br /> � � NOTES: <br /> � �4�� 9 . 1. MAIN LEVEL FLOOR SHEATHING TO BE 3/"PLYWOOD/OSB PLACED IN STAGGERED PATTERN NAILED w/0.131"0 x 3" <br /> � ��s= ' - LONG NAILS @ 6"O.C.AT PANELS EDGES&@ 12"O.C.@ PANEL INTERIOR SUPPORTS OF EQUIVALENT. <br /> � ��ss <br /> 3 Z, , 2. NAILS IN BLOCKING ARE TO BE PLACED SUCH THAT THE WOOD DOES NOT SPLIT. <br /> _ ���m 3. BLOCKING MEMBERS SHOWN MAY BE REPLACED WITH PRE-MANUFACTURED TRUSS STYLE OR FULL DEPTH MEMBER <br /> D �,�n <br /> cZi> �'�'F � BLOCKING SUCH AS I-JOIST OR LVL DESIGNED FOR 1,500 POUND LATERAL COMPRESSIVE LOAD. NAILING SHOWN IS TO <br /> z o c�'i, �+ o � o BE USED AT MINIMUM. <br /> � � oNo � � p n� 4. BLOCKING DOES NOT HAVE TO BE PLACED IN ADJACENT BAYS. IF REQUIRED USE ADDITIONAL 2x4 SPACERS AS <br /> � <br /> o m m p D r n SHOWN IN FIRST SPACE. <br /> � o a T� Z Z � 5. HOLES MAY BE INSTALLED IN BLOCKING IF REQUIRED UP TO <br /> � z � C � v n 6. 4"IN DIAMETER,MAINTAIN 3"EDGE DISTANCE. <br /> N � oQ Nyz <br /> � c) DUCT/MECHANICAL(AS REQUIRED) <br /> N � � °r° m BY OTHERS <br /> � 0 ° � m NAIL SHEATHING TO BLOCKING/TRUSSES �FRAMING <br /> N � N p w/(12)0.131"0x3"LONG NAILS BY OTHERS <br /> o c 0.131 QJx3"LONG <br /> D D NAILS @ 6"O.C. <br /> � <br /> v O � , . . . . � RIM TRUSS <br /> � ° Z BY OTHERS <br /> o m <br /> ' `'�. ` TOP NAIL RIM TO SILL <br /> ;.; <br /> � w/MIN OF(6)0.131 fD x 3" <br /> m w o � o � LONG NAILS EACH SIDE <br /> �» �•� O � a , OF BLOCKING OR TYPE <br /> `� ° � v D CONNECTOR @ <br /> �� ° � m BLOCKING SEE S10 <br /> W m � � ; <br /> 2x6MIN <br /> � � �SILL PLATE <br /> . . . . . . . . . . . . � <br /> FOUNDATION WALL SEE <br /> TRUSSES BY OTHERS� OTHER SHEETS FOR <br /> � <br /> � PROVIDE 2 x 4 MIN BLOCKING _ ' ANCHORS&WALL INFO <br /> � TOP&BOTTOM OF TRUSSES SLOPE GRADE AWAY FROM <br /> 1 AS REQUIRED TO ACHIEVE �FOUNDATION <br /> NAILING SHOWN. <br /> � � INSTALL w/(2)0.131 0 x 3" " -- <br /> � � LONG TOE NAILS <br /> �� I`�° 3/4"PLYWOOD/OSB ONE SIDE IF REQUIRED, PROVIDE 2 x 4 MIN SPACERS <br /> OF BLOCKING w/(6)0.131 0 x 3" SEE S11 FOR SPACING OF TOP&BOTTOM AT MECHANICAL UNTIL <br /> LONG NAILS TOP&BOTTOM BLOCKING SYSTEM SHOWN SPACES IN WHICH BLOCKING CAN BE <br /> d OR 1/2"PLYWOOD/OSB EACH INSTALLED,TOE NAIL TO FLOOR MEMBERS <br /> � SIDE OF BLOCKING EACH w/ w/(2)0.131 Q1 x 3"LONG NAILS <br /> � (4)0.131 0 x 3"LONG NAILS <br /> � TOP&BOTTOM <br />