My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010784 - new septic system
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Pass
>
525 Hunter Pass - 25-118-23-31-0006
>
Septic
>
1998-010784 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:09 PM
Creation date
3/2/2017 3:01:27 PM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
Hunter
Street Type
Pass
Address
525 Hunter Pass
Document Type
Septic
PIN
2511823310006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-P TESTING� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License #394 <br /> , <br /> March 1, 1997 <br /> Jyland Development <br /> Lot 2, Block 1 <br /> Hunter Pass <br /> Orono, Henn. Co., MN <br /> � This on-site sewage treatment system is designed for a Type 1, five bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are SCS soils mapped - HcC2 - Hayden clay loam. The seasonall�y <br /> saturated soils were located at 14" to 24" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The future expansion site is a pressurized mound system split into two rock beds each <br /> 10'x32'. The effluent would be delivered by installing a supply line to each rock bed with <br /> the pumping chamber altemating rock beds using the highest head pressure for the <br /> pump selection. <br /> The soils at a depth of 12" have a percolation rate averaging 10.6 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> ; <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.