My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010784 - new septic system
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Pass
>
525 Hunter Pass - 25-118-23-31-0006
>
Septic
>
1998-010784 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:09 PM
Creation date
3/2/2017 3:01:27 PM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
Hunter
Street Type
Pass
Address
525 Hunter Pass
Document Type
Septic
PIN
2511823310006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� F-17 <br /> PiJMP SELECTTON PROCEDUR& <br /> .. � E)�D PERFORAT�ON OF A PERFORATED IATERAL <br /> A. Determine pump capacity: w-•w« � <br /> Gravity Distribution T.,..,, <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of r:�•� ••��"-- <br /> . �•�•w�r saw taNr •�"w c»»ew rawk�o.ia.- <br /> . � WBte'I ll$e Td�. . . •'Mre�rw„yeprj ra�cwww <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 , ��^��^a�����t°^�°��, <br /> NM Ca0 War Tw <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. ,.,;P„„ .;-u�a.� �:•�.Eay� <br /> �. .�w«��,« <br /> �::;•::�::. .. _. . . <br /> . RAaaNir lau�M a� <br /> Pressure Distibution � ���� �""""`°""' <br /> 3.a. Select number of perforated laterals 3 <br /> b. Select perforation spacing=_�feet °fj"°'�'"'"°�"'�"'"° <br /> e.i...v�.�.sw�..n. <br /> c. Subtract 2 fti from the rock layer length. <br /> �� -2 ft._�.�_feet <br /> a«k rre�u <br /> d. Deternune the number of spaces between perforations. <br /> Length perf.spacing=�.ft.+�ft._ �� spaces Requiied Perforation Diseh e <br /> • e. ,�spaces+1=,�_perforations/lateral �+�u°���+�+°te c�*'"`� <br /> f. Muldply perforations per lateral by number of laterals to 7�3���+q. DH��Se ;�z maP,, �a�,,�, <br /> get total number of perforations. ,�-3; x �„ ,�_�perforations. (fe�U <br /> g� � X��`-�gp� 1.Oa 0.56 0.74 <br /> SELECT'E'D PUMP CAPACTTY��gpm 2.�b �.8� 1.04 <br /> B.Determine head requirements: a.Use for single famil'y homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> ,�) feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> �_feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. , �P��8� , <br /> Read friction loss in feet per 100 feet from table. � poinc of Discharge <br /> F.L._ .�,l. f�/100 ft of pipe /��� <br /> b. Determine total pipe length from pump to discharge pevation Difference� <br /> point. Add 25 percent to pipe length for fitting p�p ��� <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> �4� x 1.25= D(� feet 1.5 inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying � fr;a;a„i«.��oon,rP;a <br /> friction loss in ft/100 h by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= '�.• le x 3v0 +100= � feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> 2.7 +�_+ `d� ?S 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 � 0.30 <br /> 40 11.07 2.64 039 <br /> TOTAL I-IF.AD U b feet � 45 1a.73 3.28 � 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection bo s.bo o.s2 <br /> 1. A pump must be selected to deliver at least <br /> �gpm (Step A)with at least _ � �feet of total head (Step B). . <br />
The URL can be used to link to this page
Your browser does not support the video tag.