Laserfiche WebLink
��,� � CITY OF ORONO <br /> SEPTIC SYSTEM APPROVAL <br /> o �� o � <br /> ��`;�� ,� � y:��`����; C ITY of O�?►O�TO <br /> a � �� .��` �. � <br /> � '1 ��'� i�l�i'' 1� Municipal Oflices <br /> � � °� ��� Post OfTice Box 66 <br /> �r Crystal Bay,hiinncsota 5532.�-0066 <br /> ` � �� `����^ cso <br /> �kESH�� <br /> LOCATION: 500 Hunter Pass <br /> OWNER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVA.I.UATOR: s—P Testing �pORT DATE: March l, 1997 <br /> The City of Orono has Approved your on-site system design as of uly 15, 19 9 7 <br /> (approved-disapproved) (date) <br /> with the following conunents: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until �nal site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF R N <br /> BY �% <br /> Stephen c an, On-site Systems Manager <br /> TELEPI IONE-473-7357•FAX-473-OS10 <br />