Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Thursday,April 21, 2016 4:34 PM <br /> To: Christine Mattson <br /> Subject: RE: 500 Hunter Pass/#2016-00272 <br /> Chris, <br /> I've reviewed the Grading Plan and stamped it approved. <br /> Perimeter erosion control measures should be installed by the Contractor and inspected by the City prior to any work, <br /> including demolition.Contractor must provide minimum 24 hour notice prior to inspection. <br /> Adam <br /> From:Christine Mattson <br /> Sent:Tuesday,April 19, 2016 7:55 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject:500 Hunter Pass/#2016-00272 <br /> Adam, <br /> We received a building permit application for an in-ground pool and spa. Please review the survey dated 4-14-16 and <br /> provide comments. <br /> Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway � Orono � MN � 55356(physical addressJ <br /> PO Box 66 � Crystal Bay 0 MN ( 55323-0066(mailing addressJ <br /> '�' 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � �Ll www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> 1 <br />