My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
re: bldg permits
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Pass
>
500 Hunter Pass - 25-118-23-31-0005
>
Correspondence
>
re: bldg permits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:08 PM
Creation date
3/2/2017 1:18:04 PM
Metadata
Fields
Template:
x Address Old
House Number
500
Street Name
Hunter
Street Type
Pass
Address
500 Hunter Pass
Document Type
Correspondence
PIN
2511823310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�o�o <br /> C ITY OF ORONO <br /> � ,� Street Address: Mailing Address: Telephone(952)249-4600 <br /> y�, ti 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> 1,9 �,�' Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kssHo�` <br /> April 7,2016 <br /> Pat Henry <br /> Prestige Pools <br /> 87 West County Road C <br /> St. Paul, MN 55117 <br /> Re: Building Permit Application#2016-00272 <br /> 500 Hunter Pass <br /> On March 22, 2016 the City received a building permit application and on March 31, 2016 we received copies of the <br /> survey for an in-ground pool and spa. Staff conducted a preliminary review based on the information provided and <br /> recommends the following items be submitted or revised in order for your application to be considered complete and <br /> for the plan review to continue: <br /> 1. Certificate of Survey. A survey dated 3-8-16 was submitted but it does not show any existing or proposed <br /> topography around the proposed projects. Please provide two copies of an updated, full-size certificate of <br /> survey which meets all of the City's survey standards (enclosed) indicating the location of the proposed pool <br /> and spa(and any proposed grading). Our engineer has not reviewed the survey,so additional comments may <br /> be forthcoming. <br /> 2. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all <br /> the proposed exterior/landscaping improvements,i.e.patios,grading,sidewalks,retaining walls,etc. The plan <br /> should include the name of the individual performing the work. Any proposed patios, grading, sidewalks, <br /> retaining walls shown on the landscape plan should also be reflected on the survey. <br /> 3. Wetland. Documentation submitted with the application indicates a Level 1 delineation was conducted. <br /> Orono City Code 78-1605(copy enclosed)requires a Level 2 delineation when a wetland appears to be located <br /> within 150 feet of the proposed project. Because Orono City Code requires a 35-foot setback from any wetland <br /> for structures or hardcover,the location of the wetland must be indicated on the survey. Setbacks must be <br /> verified with wetland delineation information. <br /> Level2 Delineation is required. A Leve12 delineation must include the exact surveved boundarv of the <br /> wetland shown on the certificate of survey. <br /> 4. Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal <br /> of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City <br /> for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee <br /> conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow <br /> amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign the escrow <br /> agreement and submit a check for$2,500. <br />
The URL can be used to link to this page
Your browser does not support the video tag.