My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
all rejected submittals
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1070 Hunter Drive - 25-118-23-42-0008 (Formeraly 300 Sixth Ave N)
>
Background info/original submittals that were rejected
>
all rejected submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:16 PM
Creation date
3/1/2017 1:59:48 PM
Metadata
Fields
Template:
x Address Old
House Number
1070
Street Name
Hunter
Street Type
Drive
Address
1070 Hunter Drive
PIN
2511823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBtJFtON MEQIA:REGISTERED TREATMENT PRODUCTS:CHAMBERS ANQ QFLOW <br /> A. Enter DiSpersal Media: <br /> B. Enter the Component Len�th; �ft Enter the Component Width: �ft <br /> C. Nttmber of Components per Row=Bed Length divided by Component I.enQth tRaund up) <br /> � tt T�� ft= �companents/row <br /> D. AcWal Bed Lengih�Nurt�ber of Components/row X Ccmponent Length: <br /> �_�components X �ft = �ft <br /> E. Numbet of Rows•Bed Wtdth divided by Component Wtdth(Round upy <br /> r-� f t+ �� f�a �� rows AdJust w(dth so thts is on wfwle numDer. <br /> F. 'fatal Num�ponents��of Con�onents per Raw X Number of Rows <br /> X ` �camponents <br /> b. MOUNA SIZING <br /> A. Calcutate Mfnimum Ctean Sand Lift: 3 feet minus Oepth to Umiting Candition -Clean Sand Uft <br /> 3.0 ft • 7.3 ft = 1.7 ft Design Sand Uft(optional): r�ft <br /> e. talculate Upslope Hetght:Glean Sand Lift t media depth+caver(t ft.}=Upslope Height <br /> 1•7 ft + t,0 ft + t.Q ft= 3.T ft <br /> C. Selett Upslope Berm Multipifer(basrd on(and slope}: 2.31 <br /> l�nd Slope 96 0 1 2 3 4 5 6 7 8 9 10 12 1Z <br /> Upslope 8errn 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratto 4:i 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Cakulate Upslope 8erm W1dth:Multiplier X Upslope Mound Heigbt �Upsiope Berm Width <br /> 2.31 ft X 3.7 tt = 8.5 ft <br /> E. Calculate Orop in Elevation Under Bed; 8ed W1dth X Land Siope t 1pp•Drop(ft) <br /> 10.0 ft X 10.Q � � 100� 1.00 ft <br /> F. Calculate Downslope Mopnd Height:Upslope Height+Drop tn Elevaib� �Downslope Height <br /> 3•7 ft + l.00 ft = 4.7 ft <br /> G.Setect Oowns{opis Berm Mutt;plier lbased on lnnd slope): 4.24 <br /> La�d Slope 9G 0 2 2 3 4 5 6 7 8 9 10 21 12 <br /> Downstope 3:1 3.00 3.09 3.14 3.30 3.Q2 3.53 3.fi6 3.80 3.95 4.11 4.29 4.48 el.6g <br /> $erm Ratio 4:1 4.00 4,17 4,35 4.54 4.7b 5.00 5.2fi 5.Sb 5.88 6.25 6.67 7.1a 7.59 <br /> H. Calculate Downslope Berm Wickh:Multiptkr X Downslope Height �Downslope Berm Width <br /> 4.29 x 4.7 ft : 20.0 ft <br /> I. Calculate Minimum eerm Eo Cover Absorpiion Area:Downstope Absorption Width+4 feet <br /> 16.0 ft +�fi = 20.0 tt <br /> J. Qesign Downstope Berm=grcater of 4H and 41: 28A ft <br /> K. Select Endsi�e Betm Multipller: 3.00 (t�suolly 3.0 or 4.0) <br /> L. Calculate Endstope&rm X Downslape Mound Netght =Endslope 8erm Vllidth <br /> 3.00 ft X 4.7 ft = 14.0 ft <br /> M.Calcu(ate Marnd Width: Ups4ope Berm Width+Bed Width+Downslope Berm Width <br /> 8.5 ft + 10.0 ft ; 28.9 ft = 47.4 ft <br /> N. Calculate Mound Length: Endstope Berm Width +Bed Length +����genn yyicfth <br /> 14.Q ft + 63.0 ft « i4.0 ft = 91.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.