My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
all rejected submittals
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1070 Hunter Drive - 25-118-23-42-0008 (Formeraly 300 Sixth Ave N)
>
Background info/original submittals that were rejected
>
all rejected submittals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:16 PM
Creation date
3/1/2017 1:59:48 PM
Metadata
Fields
Template:
x Address Old
House Number
1070
Street Name
Hunter
Street Type
Drive
Address
1070 Hunter Drive
PIN
2511823420008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. UISTRIBUTION 1NEDIA: EtEGfSTERED TitEATMENT PRODUCTS:CFIAMBERS AND EZFLOW <br /> A. Enter Di5�r5a1 Media: <br /> 8. Enter the tomponent Length: C�ft Enter the Component VYidth: �it <br /> t. Number of Components per Row=Bed Ltmgth divi�d by Component Lengtfi(Rouad up) <br /> � ft + C] ft= �components/row <br /> D. Actual 8ed Length�Number af Components/row X Component Length: <br /> �camponents X �f[ _ �ii <br /> E. Number of Rows�Bed Width divided by Component Width(Round up1 <br /> � ft+ � ft� �rows ad/ust width so thts Is an whole number. <br /> F. Tatal Number ot Contiponents=Number of Ccxnponents per Row X Number of Rows <br /> � X � s �C�m���J <br /> i� {.�.�.J <br /> 6. MOUNQ SIZING <br /> A. Calculate Minimum Ctean Sand Lift:3 feet minus Depth to Umtting ConditSan =Glean Sand Lift <br /> 3.0 ft - 1.7 ft = 1.3 ft Design Sand Lift(optio�al): �tt <br /> 8. Caltulate Upstope Height:Clean Sand Uft +media depth+cover{1 ft.)=Upstope Height <br /> t.3 ft + 1.0 tt + 1.0 ft= 3.3 ft <br /> C. Select Upslope eerm Multlptier{based on land stope): Z.31 <br /> Land 51ope 96 0 1 2 3 4 S 6 7 8 9 IO 11 12 <br /> Upslope Berm 3'1 3.00 2.91 2.83 2.75 2.66 Z62 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> iistfo 4:1 4.00 3.85 3.70 3S7 3.45 3.33 3.23 3.22 3.03 2.94 2.86 2.78 2J0 <br /> D. Cakulate Upslope 8ecm Width:Mu[tiplkr X Upstope Mound Hefght =Upstope Berm Width <br /> 2.31 ft X 3.3 ft � 7.7 (t <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope f 10Q=Drop(ft) <br /> 50.0 ft X 10.0 � + 100= 1.00 h <br /> F. Cakulate Downslope Mn�d Height:Upstope Height+Orop in£tevatbn =Downslope Height <br /> 3.3 ft + 1.00 ft = 4.3 ft <br /> G. Seiect Downslope Berm Multiplier(based on laad slope): 6.67 <br /> Land Slo 'K 0 1 2 3 4 5 6 7 8 9 10 li 12 <br /> Downsiope 3:2 3.� 3.09 3.19 3.30 3.4i 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> 8erm tiatlo 4:1 4.00 4.iT 4.35 4.54 4.76 5.00 5.26 SS6 5.88 6.25 6.67 7.24 7.69 <br /> ti. Catwlate Downslope Berm Wtdth:Multiplier X Downstope tkight =Downslope Berm Width <br /> 6.67 x 4.3 it = 28.9 �t <br /> i. Cakutate Minimum 8erm to Cover Absarptbn Area:Dawnstope Absorptbn Wtdth*4 feet <br /> 15.0 ft +�J ft = 20.0 ft <br /> J. Design Dovmslape 8erm C greater af 4H and 41: 28.9 ft <br /> K. Selett Endslope Berm Multlptkr: 3.00 (usucffy�.0 or 4.0) <br /> l. Calculate Endslope Berm X Qow�slope Moumd Hei�t ■Endslope Bertn Width <br /> 3.OQ ft X 4.3 ft � 13.0 ft <br /> M.Cslculate Mound Width: Upslope Berm Witlth+Bed Width«pownslope Berm Width <br /> 7.7 tt + 10.0 ft + 28.9 ft = 46.6 ft <br /> N. Wtcutate Mound Length:Endstope Berm Width +Bed Length +Endslope Berm Width <br /> 13.Q ft + 63.0 ft + 13.0 ft = 89.Q ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.