Laserfiche WebLink
The survey received yesterday is dated 5-9-16 however, it is not signed. When comparing the recently <br /> received survey, we noted the previously submitted survey is also dated 5-9-16, however the surveys do not <br /> match. <br />• Rain garden is missing annotations and the weir is no longer shown. Grading around the proposed rain <br /> garden is different. Has the design changed since the last review? Please clarify. <br />• Proposed earth excavation annotations are missing. <br /> Please have the surveyor submit two, signed copies of the survey for our review. <br /> Thankyou! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway ( Orono � MN ( 55356 (physical addressJ <br /> PO Box 66 � Crystal Bay � MN � 55323-0066 (mailing addressJ <br /> '� 952.249.4620 I 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 23 through Friday, September 2,2016) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,July 4, 2016 <br /> 2 <br />