My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#6491-CUP-2015
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1125 Hunter Drive - 25-118-23-31-0004
>
Resolutions
>
#6491-CUP-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:14:00 PM
Creation date
3/1/2017 12:13:42 PM
Metadata
Fields
Template:
x Address Old
House Number
1125
Street Name
Hunter
Street Type
Drive
Address
1125 Hunter Drive
Document Type
Resolutions
PIN
2511823310004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution <br /> SP TESTING INC. Exhibit B <br /> Steven B.Schirmers —951 Katydid Lane NE—St.Michael,MN 55376 <br /> Cert.No 627 — State License#394 — Phone 763-497-3566— Fax 763-497-5011 <br /> www.sptesting.wastewater@comcast.net— schirmerswastewater.com <br /> February 11, 2015 <br /> Chris Perrry <br /> 1125 Hunter Dr. <br /> Orono, MN <br /> This site has an existing on-site sewage treatment system which has a <br /> Multi-Flo Wastewater Treatment System. <br /> A restroom is proposed in the existing barn, garage. This will require <br /> A 1000 gallon pumping tank with 2 maintenance holes, one for the <br /> trash trap & one for a pump vault which will pump 50ga1/cycle to the <br /> existing pumping chamber#1 entering at the riser. The supply line will <br /> need to be a directional bore & insulated through the driveway at a <br /> minimum. A 74" diameter pipe is available which is all insulated per <br /> Elmer J. Peterson Co. The 4" supply line from the barn, top of the tank <br /> & 2' down the sides must be insulated. The ground at pump tank#1 is <br /> elev. 96.6 & the top of the tank at elev.94.2 <br /> All neighboring wells are located greater than 100' away from the <br /> proposed system. <br /> The pump will be 1/2hp with 33' of head at 25 gal/min. The supply line <br /> will 185' long & be 1-1/4"diameter, (7.8 gal/100' x 185' = 14' of drain <br /> back). The pump will cycle 50 gal & 14 gallons drain back pumping 64 <br /> gal/cycle. <br /> Steven B. Schirmers <br /> FEB 12 2015 <br /> Atrfe <br /> Tr 3 718 CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.