Laserfiche WebLink
�_____��. <br /> � O� CITY OF ORONO <br /> SEPTIC SYSTEM APPROVAL <br /> 0 � � <br /> ��{�-,°�,- CITY of OR��TO <br /> � 1' �� �, MunkipalOtFces <br /> , a.2_ <br /> �,� '''ti'•��r �. Post Office Box 66 . <br /> � r ���r G Crystal Bay,Minnesota 5532.3-0066 <br /> �9 �'i{ ��' 'g,�' <br /> k'ESYi� <br /> � LOCATION: 1125 Hunter Dr. <br /> OWNER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S-P Testing REPORT DATE: November 4 , 1996 <br /> The City of Orono has Approved your on-site system design as of February 14 , 19 9 7 <br /> (approved-disapproved) (date) <br /> with d�e following corrunents:_ Extra care must be taken to protect the proposed <br /> drainfield site as no alternate site is available on the property. <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit triust <br /> be issued to a licensed septic contractor prior to installation. A list of�urrently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior,approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF O <br /> By <br /> Stephen W an, n-site ys ems anager <br /> TELEPHONE—473-7357•FAX-473-0510 <br />