My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
H
>
Hunt Farm Road
>
1005 Hunt Farm Road - 30-118-23-42-0006
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:05 PM
Creation date
3/1/2017 11:34:12 AM
Metadata
Fields
Template:
x Address Old
House Number
1005
Street Name
Hunt Farm
Street Type
Road
Address
1005 Hunt Farm Road
Document Type
Septic
PIN
3011823420006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRESSURE DISTRIBUTION SYSTEM <br /> All boxed recfangles must be entered,the rest will be cak:ulated. <br /> 1. Seled number of perforated laterals: 03 ��u..-�:�<<-h�� <br /> 2. Select perforation spacing= 03 ft L��"��Q~'� T s <br /> ��r..,.•k <br /> i4:i�.`•..��nK i�s_s�ia^ --- <br /> 3. Since perforations should not be placed doser that 1 foot to <br /> the edge of the rock layer(see diagram),subtrad 2 feet from <br /> the rodc layer len th <br /> 62 -2ft= 60 ft <br /> 4 Detertnine the number of spaces between perForations. <br /> Divide the length(3)by perforation spaang(2)and round down to nearest whole number. <br /> Perforation spaang= 60 ft/ 3 ft= 20 <br /> 5. Number of perforations is equal to one plus the number of perforation spaces(4). <br /> •Check figure E-4 to assure the number of perforetions per latera/guarantees <br /> <10%disd►aige variation. ' <br /> 2p spaces+1 = 21 peiforations/lateral <br /> E�Maxfmum Number of 7/4 inch perforatlons E-6 PerForatlon Dfscha e in GPM � <br /> lateral to uara�es<10X dlscha variation Head Perforations diameter <br /> p��� feet inc�es <br /> �p�y 3/16 7/32 1/4 <br /> Teet 1 inch 1.25 inch 1.5 inch 2.0 inch 1' 0.42 0.56 0.74 <br /> 2.5 8 14 18 28 2b 0.59 0.80 1.04 <br /> 3.0 8 13 17 26 5 0.94 1.26 1.65 <br /> 3.3 7 12 16 25 a. Uae�.o foot for ainpl�tamiy homes. <br /> 4.0 7 11 15 23 b.use 2.o reee�cr ' eiae <br /> 5.0 6 10 14 22 <br /> 6. A Total number of perforations=perforations per lateral(5)times number of laterals(1). <br /> 21 perfs/lat x 3 laterals= 63 perForations <br /> B.Cak�late the square footage per pertoration. <br /> Reoommended value is 6-10 sqft/perf.Does not apply to at-grades. <br /> 1. Rodc bed area=rock width(ft)x rock length(ft) <br /> 10 ft x 62 ft= 620 ft� <br /> 2. Square foot per perforation=Rodc Bed Area/number of perfs(6) <br /> 620.0 ft� / 63 perfs = 9.8 ft�/perf <br /> 7. Detertnine required flow rate by multiplying the total number <br /> of perforations(GA)by flanr per perforations see figure E�) <br /> 63 perfs x 0.74 gpm/perfs= 46.6 gpm � __- - ___--- ; <br /> _ �,.,t,� <br /> 8. If laterals are connected to header pipe as shown - =��� �r� <br /> in Figure E-1,to select minimum required lateral �°� __ z`. <br /> diameter,enter figure E-4 with perforation spaang(2)and � ` " ` •_�. <br /> =- >�,,.,...�.,M. <br /> ��. <br /> ,_ �. . ,..,�,.� , <br /> number of perforations per lateral(5). �.E-�:M����d�w«�,..»^� ; <br /> Select minimum diameter for perforated laterals= 2.0 inches <br /> 9. If perforated lateral system is attached to manifold pipe ��-�,a;� "' ' <br /> near the center, like Figure E-2,perforated lateral length(3) .�- - - `' <br /> and number of perForations per lateral(5)will be approximately �t " - - <br /> one half of that in step 8. Using these values,seled • � ,,_. � ';�_ > - <br /> minimum diameter for perforated lateral= 1.5 inches. �--- �r�� <br /> I hereby certify that I have c�mpleted this wo�1c in accorcJance with all applicable ordinances,rules and laws. <br /> (signature) 810 (license#) p�f (date) <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.