Laserfiche WebLink
� / <br /> Lot l, Block 3 <br /> Huntington Farm <br /> Orono <br /> (2) <br /> Keep all heavy equipment off of the proposed treatment area before <br /> and after construction. The treatment area should be marked off <br /> before construction. This Design is not valid & the system will <br /> need to be relocated if failure to protect the areas proposed <br /> for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should � <br /> have no problem in treating septic effluent effectively. <br /> Nothing other than gray water (laundry, showers, etc. ) human waste <br /> & toilet tissue should be disposed into the septic tanks. Garbage <br /> disposals are not recommended. Excessive amounts of soaps, cleaning <br /> agents & chlorine agents may kill the bacteria needed to treat <br /> septic effluent. Additives are not recommended. Recommend to pump <br /> & clean your tank through the manhole by a certified pumper every <br /> year if you have 1 tank and every 2 years if you have two tanks . <br /> The future site is located in the UPA Power Line Easement, see <br /> attached letter from UPA, dated February 14, 1989. The corners of <br /> the system must be clearly marked to prevent maintenance equipment <br /> travel over the site. This will need approval from the City Official. <br /> � <br /> Steven B. chirmers <br /> SBS/ds <br />