Laserfiche WebLink
1. Protection fencing should be indicated around the proposed drainfield site to ensure it is not impacted during <br /> construction. <br /> 2. The siltfence and protection fencing should be installed by the contractor and inspected by the City prior to any <br /> work. The contractor must provide minimum 24 hour notice prior to inspection. <br /> 3. A financial security of$4,000 from the Applicant is recommended for erosion control and engineering oversight. <br /> The financial security is intended to provide protection in the event that it becomes necessary for the City to <br /> install or maintain erosion and sediment control within the project area and covers the cost of vegetation re- <br /> establishment if the applicant is unable to follow through with the conditions of approval. <br /> If you have any questions or comments, please contact me to discuss. <br /> Thanks, <br /> Robert E. Bean,Jr, P.E. <br /> LEED Green Assoc. <br /> Water Resources Engineer <br /> Bolton & Menk, Inc. <br /> Consulting Engineers&Surveyors <br /> 2638 Shadow Lane, Suite 200 <br /> Chaska, MN 55318 <br /> P:(952)448-8838, ext 2892 <br /> F:(952)448-8805 <br /> email: bobbe@bolton-menk.com <br /> www.bolton-menk.com <br /> This email has been scanned by the Symantec Email Security.cloud service. <br /> For more information please visit http://www.symanteccloud.com <br /> 2 <br />