My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P02047 - mechanical
Orono
>
Property Files
>
Street Address
>
H
>
Hunt Farm Road
>
825 Hunt Farm Road - 30-118-23-44-0003
>
Permits/Inspections
>
2000-P02047 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:12 PM
Creation date
2/28/2017 12:12:38 PM
Metadata
Fields
Template:
x Address Old
House Number
825
Street Name
Hunt Farm
Street Type
Road
Address
825 Hunt Farm Road
Document Type
Permits/Inspections
PIN
3011823440003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� pG �o�� <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desi�ns - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: New X Addition Repair Replace <br /> �( Residential Commercial <br /> JOB SITE: �� � /�u�/ /=G,-,�-._ �� Zip: <br /> Owner's Name: L�,,-, /a r�/;��-o Telephone Number: <br /> Mailing Address— City: Zip: <br /> Contractor's Name: �� /,,,,,,p � -y���l ��,� Telephone Number: �I z -vz i- z��i� <br /> Mailing Address:15 y��� 5, 1 v.�-��i S� � c.� City: r}�,J�,,,��- Zip:__�;s 3 o� <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make� <br /> Model: <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power <br /> �� � --�--U� � 'W�I !��N� � <br /> �,r w ��� � 4 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.