Laserfiche WebLink
}. !, <br /> �O� <br /> O O CITY OF ORONO <br /> � r � MunicipalOffices <br /> �, Street Address Mailing Address: <br /> � �j'�' 2750 Kelley Parkway P.O. Box 66 <br /> '�,� �i Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> k:EsH04' <br /> To: The Current Owner of Address 825 HUNT FARM RD <br /> City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> periodic basis. The onsite sewage treatment system at the above address has been inspected and <br /> the following is known about the system. A sketch of the known components of the system is <br /> available for most properties at the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> this notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will result in referral to the City Attorney for legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The city recommends the septic tank(s) andlor lift tank be serviced and umped out every three <br /> (3) years. City records indicate the tank(s)were last pumped out on �. .�,� <br /> The tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allows for proper cleaning. <br /> Comments: <br /> Inspector: `' Date of Inspection: � — �� <br /> �4��� <br /> Telephoae (952) 249-4600 . Fazc(952) 249-4616 <br /> www.ci.orono.mn.us <br />