My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-2007 Council Packet
Orono
>
City Council
>
2007
>
12-10-2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2015 2:08:26 PM
Creation date
4/9/2015 4:08:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, November 26, 2007 <br />7:00 o’clock p.m. <br />___________________________________________________________________________________ <br /> <br />PAGE 13 of 32 <br />(#07-3323 Structures Unlimited On Behalf of Judson and Aleya, Continued) <br /> <br />Langhans indicated the foundation variance is really a moot point and the issue is the lakeshore setback <br />and hardcover variances. The height of the original structure did not require a variance but they have <br />reduced the height of the structure. The structure is a story and a half, the floor trusses are 18 inches, <br />with a two and a half foot knee wall at the short point, and four feet in, the ceiling height is 5’/11”, <br />which gives them some livable space in that area. Langhans pointed out that the more the pitch of the <br />roof is dropped, the less living space that is available. <br /> <br />Murphy stated he is in agreement with the idea of dropping the knee walls and extending the eaves. <br /> <br />Rahn asked what they are doing with the foundation and whether the foundation would be replaced. <br /> <br />Langhans stated the existing footings were two feet deep and were replaced this past summer. <br /> <br />Rahn asked if this is a project that is slowly evolving or whether they have always envisioned this type <br />of project from the start. Rahn stated the methodology of the project seems backwards. <br /> <br />Langhans stated the design of the house before the Council is utilizing the existing footing type and <br />foundation type. <br /> <br />Rahn asked if all the footings would be replaced. <br /> <br />Langhans indicated they would be but that they are pier footings. <br /> <br />Rahn commented in his view the foundation is basically being replaced. Rahn asked if the first floor <br />cap would be saved. <br /> <br />Langhans stated there are concrete piers in the ground, which a large number have been replaced. The <br />exterior first floor walls will stay, with the interior walls being removed. <br /> <br /> <br /> <br />Item #02 - CC Agenda - 12/10/07 <br />Approval of Council Minutes 11/26/07 [Page 13 of 32]
The URL can be used to link to this page
Your browser does not support the video tag.