Laserfiche WebLink
N <br />� <br /> Page5of5 <br /> ROOM.FINISH SCHEDULE <br /> ROOM CEILING WALLS FINISH UNDER- BASE CASING <br /> FLOOR LAYMENT <br /> main floor patch,swm patch b/o n/a f-132 birch <br /> famil rm. coat-smooth prince <br /> dining �o n/a <br /> room <br /> living b/o/ n/a <br /> foyer b/o n/a <br /> master <br /> bd.,bath <br /> den patch,skim patch., <br /> coat,smooth skim,coat b/o Na f-132 <br /> sun ktty pine . exist existing existing existing existing <br /> room 6" v=oint <br /> I/I patch if patch existing existing existing birch <br /> bed needed rince <br /> I/I patch,skim patch existing existing existing existing <br /> famil ,coat,smooth <br /> rec. 5/8" s.r. 1/2" s.r. b/o existing f-132 birch <br /> room smooth rince <br /> game 5/8" s.r. 1/2" s.r. b/o existing f-132 <br /> room smooth <br /> storage 1/4" cedar 1/4" cedar b/o existing <br /> room <br /> [] CROWN MOLDING <br /> * f-614 - mstr. bed and den and family room <br /> * f-614 -f-733 dining room and living room <br /> " f-749 w/full 6" bd for a 3 pc. crown in foyer <br /> r <br /> i <br />