My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00690 - interior remodel
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
325 Hollander Road - 25-118-23-43-0024/4
>
Permits/Inspections
>
2013-00690 - interior remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:00 PM
Creation date
2/27/2017 12:40:42 PM
Metadata
Fields
Template:
x Address Old
House Number
325
Street Name
Hollander
Street Type
Road
Address
325 Hollander Road
Document Type
Permits/Inspections
PIN
2511823430024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r _ 3730 Shady Oak Road <br /> Minnetonka, MN 55305 <br /> y� �� �� Phone (952) 933-3930 <br />� � Cell (612) 723-5248 <br />': . . � Fax (952) 933-3033 <br />! E-mail djpaquette@comcast.net <br /> CONSTRUCTION COMPANY C� �"� � D('��� www•paquetteconstruction.com <br /> WORK ORDER <br /> Client: Jerry Golinvaux <br /> Location: 325 Hollander Road <br /> Wayzata, MN 55391 <br /> Master Bath Remodel and Misc. Kitchen Updates <br /> 1. Kitchen updates <br /> a. Backsplash —north and east elevations (31 sq. ft.) <br /> *Remove the existing backsplash tile at sink and cook top areas and dispose of. <br /> *Repair walls to allow for new tile. <br /> *Supply and install new backsplash tile to the north and east walls. (Counter top to <br /> underside of uppers and hood area.) <br /> *Grout and seal new tile. <br /> b. General <br /> *Clean site daily. � <br /> *Haul all debris. SPECIAL NOTE <br /> SEE ATTACHED SHEET <br /> 2. Master Bath —preliminary proposal � FOR S�.-+���o�� Q`����° <br /> a. Removal and disposal , CODE REQUIREMENTS � <br /> *Shower complete—tile, tile backer, floor tile, pan and partial walls. <br /> *Bath floor down to sub floor. <br /> *Toilet, lavs (2), tub and vanity. <br /> *All wall tile and tile backer. <br /> *Hardware, shower door and mirror. (mirror—TBD). <br /> b. Framing—reframe the following: <br /> *Niche in shower. <br /> a���o cr��Y <br /> REVIEWED for� COnE CO�MPLIANCE <br /> PLAN CHECKED BY DATE 7" ZZ -�'3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.