My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00262 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
325 Hollander Road - 25-118-23-43-0024/4
>
Septic
>
2009-00262 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:00 PM
Creation date
2/27/2017 12:40:29 PM
Metadata
Fields
Template:
x Address Old
House Number
325
Street Name
Hollander
Street Type
Road
Address
325 Hollander Road
Document Type
Septic
PIN
2511823430024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' .7-P TESTING� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> ^ 951 Katydid Lane NE • St. Michael, MN 55376 �6'T��'497-3566 �(�,� <br /> � FAX (612)-497-5011 <br /> State License#394 <br /> August 1, 1997 <br /> Charlotte Galiniaux <br /> 325 Hollander Road <br /> Orono, Henn. Co., MN <br /> This site has an existing on-site sewage treatment system classified as failed due to not <br /> meeting the 2' separation from the bottom of the system and the saturated soil. The <br /> system is approximately 3' deep with the saturated soil at 24" to 30" deep. To <br /> adequately treat septic effluent, a new system will need to be installed. <br /> This on-site sewage treatment system is designed for a Type 1, four bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The property lines must be verified prior to installation of the system. <br /> The soils on this site are SCS soils mapped - HcB2 - Hayden clay loam. The seasonally <br /> saturated soils were located at 18" to 26" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 17.8 mpi. <br /> . . , <br /> The existing tank may be used upon approval from the local Inspector. The tank must <br /> be water tight, if not abandon, pump &fill with soil. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.