My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01567 - new structure
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3295 Crystal Bay Road - 17-117-23-41-0013
>
Permits/Inspections
>
2016-01567 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:39:37 PM
Creation date
2/27/2017 9:31:51 AM
Metadata
Fields
Template:
x Address Old
House Number
3295
Street Name
Crystal Bay
Street Type
Road
Address
3295 Crystal Bay Road
Document Type
Permits/Inspections
PIN
1711723410013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2016-015� / Pillar Homes <br /> Builder Representative Name: � G��� �-.1/I✓� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a �_ <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order will � � <br /> be issued. <br /> Schedule a minimum of one hour for the framing inspection. �j <br /> l.� <br /> Perimeter sediment control measures should be installed by the Contractor and inspected by the <br /> City prior to any work, including demolition. Contractor must provide minimum 24 hour notice �j <br /> prior to inspection. V` <br /> Erosion control shall be installed and maintained throughout the entire project and must remain �� <br /> until vegetation has been established. <br /> The condition of the access drive has been documented. Please take care to keep the drive clear <br />' of mud and debris,and repair all ruts prior to CO/TCO. The property owner shall be responsible J� <br /> for cleaning and repair of roadways for any adverse impacts. <br /> A pre-construction meeting involving all relevant parties shall be held at least 7 days prior to <br /> commencement of grading work,following issuance of all permits for the project. <br /> Existing trees should be protected from grading and trucking through snow fence or similar. Tree �. <br /> protection should be inspected by the City prior to commencement of grading; provide a J j <br /> minimum of a 24-hour notice prior to inspection. �—'� <br /> The pair of retaining walls at the window well are right at the threshold of requiring an engineered <br /> plan. Walls greater than 4'in height must be designed by a licensed professional,and plans must <br /> be submitted to the City for review prior to the approval of the permit. Tiered walls are ��� <br /> considered one wall unless they are separated by at least twice the height of the lower wall <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations�`--- � <br /> must be submitted and approved. <br /> The swale on the west side of the home should be capable of handling run off from the shared <br /> driveway on the south of the home. Care must be taken along that drainage line to ensure the <br /> bluff area is stabilized sufficiently to prevent erosion. Recommend consultation with the home �� <br /> owners at 3309 as they have experience with the draining issues in the area. Should the proposed <br /> swale be over the water main a minimum of 8Ft of cover must be maintained. <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the � <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. <br /> w:\street files\crystal bay rd\3295\builder acknowledgement form.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.