My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01567 - new structure
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3295 Crystal Bay Road - 17-117-23-41-0013
>
Permits/Inspections
>
2016-01567 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:39:37 PM
Creation date
2/27/2017 9:31:51 AM
Metadata
Fields
Template:
x Address Old
House Number
3295
Street Name
Crystal Bay
Street Type
Road
Address
3295 Crystal Bay Road
Document Type
Permits/Inspections
PIN
1711723410013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> lanuary 30,2017 <br /> 3295 Crystal Bay Road <br /> Page 2 of 2 <br /> Escrow&Escrow Agreement. Permits involving grading and/or review by the City's engineer require submittal <br /> ;�of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement to the City <br /> �� for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will guarantee <br /> conformance with City Code Chapter 79 relating to erosion control and stormwater. The required escrow <br /> amount for this project is$2,500. We currently hold$2,500 in conjunction with the land use application,so no <br /> additional escrow money is needed at this time. Please have the property owner sign the enclosed, updated <br /> agreement and return. <br /> The following are advisory comments: <br /> 1. There are several retaining walls depicted at just under 4 feet in height. Should retaining walls exceed 4 feet <br /> in height they must be designed by a licensed professional,and plans must be submitted to the City for review <br /> rior to construction. <br /> _ ;1�� In order to receive the Sewer Availability Charge(SAC)credit,a demolition permit must be issued prior to or at <br /> , <br />� ��� � the same time as the building permit is issued. If the building permit is issued first a SAC fee of$2,485 will be <br /> required at the time the demolition permit is issued. <br />\�� 3. Separate sewer and water disconnedion and reconnection permits are required. <br /> 4. The condition of the access gravel drive will be cataloged and any damage must be corrected and returned to <br /> its original condition prior to the issuance of the Certificate of Occupancy. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on <br /> the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> ristine Mattson <br /> Planning Assistant <br /> c via email KC Chermak <br /> Greg Blasko <br /> Mark Gronberg <br /> Roger Peitso, Building Official <br /> Jeremy Barnhart,Community Development Director <br /> enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.