Laserfiche WebLink
Revised and updated <br /> February 3, 2017 <br /> KC Chermak VIA EMAIL <br /> Pillar Homes Partner, Inc. <br /> 1700 Niagara Lane <br /> Plymouth, MN 55447 <br /> Re: Building Permit Application#2016-01567 <br /> 3295 Crystal Bay Road <br /> The City received a building permit application for a new single family home. Staff conducted a preliminary review <br /> based on the information provided and recommends the following items be submitted or revised in order for your <br /> application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. A survey was submitted but it doesn't meet some of the City's survey requirements. <br /> Please provide two copies of an updated, full-size certificate of survey which meets all of the City's survey <br /> standards (enclosed): <br /> a. The top of foundation elevation is shown on the survey. Please have the surveyor show the point or <br /> spot on the perimeter of the foundation where the top of foundation elevation is in reference to. <br /> Please note, we expect the location to be consistent when submitting the foundation as-built. <br /> Completed <br /> b. The site plan does not depict the water main and associated easement. Attached is a copy of the <br /> easement and exhibit.Completed <br /> c. The survey elevations show a retaining wall that would measure 5 feet 8 inches around the window <br /> well. Walls over 4 feet require engineered plans to be submitted and approved prior to the issuance <br /> of the building permit application. Plan amended <br /> d. The swale on the west side of the home should be capable of handling run off from the shared <br /> driveway on the south of the home. Care must be taken along that drainage line to ensure the bluff <br /> area is stabilized sufficiently to prevent erosion. We recommend consultation with the home owners <br /> at 3309 Crystal Bay Road as they have experience with the draining issues in the area. Should the <br /> proposed swale be over the water main a minimum of 8 feet of cover must be maintained. <br /> 2. Building Plans. <br /> a. The building plans show an expansion over the garage within the rear setback. Council must approve <br /> the encroachment prior to construction. Construction plans dated 12-22-16 have been redlined. The <br /> City Council will review this change at their meeting on February 13, 2017. <br /> b. The building plans indicate a stepped-retaining wall around the window well and the survey shows a <br /> single wall. Please provide clarification. Both plan sets reference stepped retaining walls <br /> c. Sheet 4 shows a balcony from the loft area extending 1'6"beyond the area allowed by the variance. <br /> This balcony will need to be pulled back to be no further than 3 feet beyond the main line of the <br /> house. <br /> 3. Resolution and Encroachment Agreements. Prior to the issuance of the building permit,the revised resolution <br /> and encroachment agreements must be signed. <br />