Laserfiche WebLink
Certificate of Completion <br /> Duct Sealing Performed For <br /> 350 <br /> Concepts, Geothermal <br /> 2480 Casco Point Rd 340 <br /> TO\ <br /> Orono, M/N 55323 <br /> 250 <br /> Overall Sealing Results N 200 <br /> When like arrived, <br /> YOUR DUCTS HAD: i 50 <br /> 286.1 CFM of Leakage, equivalent to a <br /> ioo <br /> 54.1 Square Inch Hole <br /> T/rsequa/s 171.7 refrigetatasfid/ofarlossevery hour <br /> 50 <br /> After like finished, <br /> YOUR DUCTS HAVE: <br /> 16.8 CFM of Leakage, equivalent to a 5 , 15 20 25 30 35 40 45 <br /> Seahng'ITE+n MinJtes <br /> 3.2 Square Inch Hole <br /> This corresponds to a in Aeroseal Technician Chris Varner <br /> Duct Leakage. Aeroseal Case ID 4078 <br /> Date of Seal 11/8/2017 <br /> Nate: Duct Leakage results are calculated in Cubic System Description North Furnace <br /> Feet per Minute(CFM) measured at a standard <br /> OPERATING PRESSURE of 25 Pa. Seal Description Main Duct <br /> Hardware HorneSeal <br /> AERO Duct Sealing Performed By: <br /> ID LICt Sealing From The Inside <br /> Varner heating and cooling <br /> 776 35th St Nw <br /> Buffalo, Minnesota <br />